Products & Solutions
Use Cases
Resources
company
IPT PowerTech Remote Monitoring System

Integrated Civil, Power, and Telecom Infrastructure for LS ELECTRIC Iraq

Integrated Civil, Power, and Telecom Infrastructure for LS ELECTRIC Iraq

Integrated Civil, Power, and Telecom Infrastructure for LS ELECTRIC Iraq

Full turnkey project connecting 350 substations across Iraq through telecom and power integration.

Full turnkey project connecting 350 substations across Iraq through telecom and power integration.

Full turnkey project connecting 350 substations across Iraq through telecom and power integration.

Project Scope

Engineering, procurement, and construction of civil, power, and telecommunication systems for 350 substations

Client

LS ELECTRIC (formerly LSIS), South Korea

Year

2025

Region

Middle East

The Challenge

Delivering a Unified EPC Solution in a Complex Environment

As part of its regional expansion in the Middle East, LS ELECTRIC aimed to deploy 350 telecom towers across high- and medium-tension substations in Iraq to connect them to regional data centers. The challenge lay in executing an integrated civil, power, and telecom infrastructure under complex field conditions, including regional instability and COVID-19 disruptions. LS ELECTRIC required a single contractor with proven multidisciplinary capability and local execution strength to deliver a complete, high-quality turnkey solution.

The Solution

End-to-End Turnkey Delivery Across Civil, Power, and Telecom Systems

IPT PowerTech executed the project as a full-scope EPC contractor, delivering civil works, power systems, and telecom network integration. The project covered site preparation, structural works, electrical design and commissioning, and secure telecom network deployment across Iraq’s Basra, Najaf, Hilla, and KUT regions. IPT applied an integrated project management model, aligning all technical disciplines under one execution framework to minimize interface risk and ensure consistency. Adaptive scheduling and close coordination with LS ELECTRIC helped overcome logistical and pandemic-related constraints, while maintaining international quality, safety, and HSE standards throughout the ten-year program.

IPT PowerTech RMS

Full turnkey project connecting 350 substations

IPT PowerTech RMS

Full turnkey project connecting 350 substations

IPT PowerTech RMS

Site preparation, structural works, electrical design and commissioning, and secure telecom network

Site preparation, structural works, electrical design and commissioning, and secure telecom network

Results

Unified Infrastructure Supporting National Connectivity

The project was successfully completed in August 2025, with phased deliveries starting in 2018. IPT’s single-source execution improved project efficiency, reduced interface complexity, and ensured seamless commissioning across 350 sites. The new infrastructure enhanced connectivity, operational reliability, and data integration across LS ELECTRIC’s Iraqi substations. Beyond technical delivery, the project strengthened long-term collaboration between LS ELECTRIC and IPT PowerTech, reinforcing both companies’ roles in advancing smart, resilient power networks in the region.

Related Solutions

Smarter energy starts with smarter systems

Empowering Critical Infrastructure With Smarter Greener Energy

Contact

+961 1 992525

info@iptpowertech.com

IPT PowerTech Group BCD, Omar Daouk Str.,
Daouk Building, 1st floor P.O. Box 113-5300 Beirut - Lebanon

© 2025 IPT PowerTech Group. All rights reserved.

Empowering Critical Infrastructure With Smarter Greener Energy

Contact

+961 1 992525

info@iptpowertech.com

IPT PowerTech Group BCD, Omar Daouk Str.,
Daouk Building, 1st floor P.O. Box 113-5300 Beirut - Lebanon

© 2025 IPT PowerTech Group. All rights reserved.